is located on the left bank of the reservoir at El.272.5 m. From the intake until the surge tank; water is conveyed through a circular, reinforced concrete, 2.5 m-diameter conduit.
LATEST NEWS AND ANNOUNCMENTS
15
Jul
EMPLOYEE WELLNESS PROGRAM
CBK Power Company Limited continuously promote healthy lifestyle and consistently enhances the quality of life of all employe[..]