designed in such a way as to permit the free flow of water at the Dam when it reaches 332.50 masl.
CBK Power Company Limited continuously promote healthy lifestyle and consistently enhances the quality of life of all employe[..]
After the completion of the restoration of Botocan-Caliraya Transmission line and the resumption of Botocan Units (B01,B02,B0[..]
This environmental program aims to promote individual responsibility towards proper segregation, collection, transport, stora[..]
This is a collaborative effort among the members of the Emergency Response Team to stop, contain, or recover the spilled mate[..]